Footing Detail With Siding

8 ledge block 45 inside miter.
Footing detail with siding. Monolithic footing slab masonry finish 12 2015. Building wall or siding flashing details at horizontal surfaces. Wall or siding connection to foundation top porch floors slabs. The reader is referred to tek 3 11 concrete masonry basement wall construction tek 19 3b preventing water penetration in below grade concrete masonry walls and ncma s basement manual for more detailed design and.
This aritcle describes the cause repair and prevention of leaks rot damage at a wood framed wall that was not properly flashed and sealed at the wall bottom. Monolithic footing slab stucco finish 12 2015. Instantly access installation info technical bulletins sds sheets more. This tek contains details for various types of concrete masonry foundation walls with accompanying text as appropriate.
Let s talk about foundation footers. 8 ledge block 45 outside miter. In termite country that wood must be stripped when the forms come off. Foundation footing detail it s all about great soil steel.
Installing foundation footings posts. This is very important when taking photos of defects in things like a concrete slab crack a scratch on siding or a door etc. Aec construction details autocad dwg format a collection of over 9 230 2d construction details and drawings for residential and commercial application. Best materials ph.
Call 811 before digging. One hundred twenty major categories of fully editable and scalable drawings and details in autocad format. Monolithic footing slab w siding exterior. A footer got its name from our own anatomy.
A frame house with wood siding and drywall interiors can probably handle up to 1 2 an inch of differential foundation movement but even 1 4 of an inch of uneven settling is enough to cause cracks in masonry tile or plaster. Calling the dig line before beginning can prevent the possibility of cutting underground utilities. Once your deck has been laid out and the framing has been planned out it s time to begin installing posts. 6 ledge block 45 inside miter.
When you form the walls the bottom of the forms must be capped with a piece of wood where the forms pass over empty space.